Tuesday, January 27, 2015

Space1 January 2015 Update

SPACE1 JANUARY 2015 UPDATE
January 2015 is one of the most productive months for Space1's great space tourism adventure introducing humans to safe space. Numerous new ideas are in effect. The partial list is seen below.

* More rocket and aerospace schooling
* Extensive research in rocketry
* Improvements to Altimeters
* Dual deployment
* Engine design research
* Parts cost analysis
* The most powerful engines determination
* New spaceports
* Rocket global analysis 
* Business meetings
* International travel
* Defining some missions in space
* Develop methods for ground safety
* Development of the Electric Rocket
* Engine production decisions
* Fireproofing invention
* Safety code development
* Developed a business synopsis
* Analyzed space launches
* Calculated thrust ratios and parameters
* Reviewed rocket simulation programs
* Developed addtl. space tourism plans
* Designed a new 2015 logo
* Plan historical preservation for first space tourists
* Develop a list of Space1 tourism advantages
* Completed a space rocket size analysis
* Rocket weight analysis
* Assembly analysis
* Initiated tests
* Electronics development
* Development of 2015's ASR Assurance Safety Rocket
* Firewall analysis and design
* Established the rocket visuals
* Designed a new rocket with size change
* Worked on the space capsule
* Analysis of payload capacity
* Work on couplers
* Development of the Space1 Rocket Observatory
* Telescope Rocket Observatory research
* OBS design
* Developed land area
* Reviewed safety
* Researched safety
* Implemented addtl. safety
* New staff